If you’re upgrading, changing platform, replacing a server or moving to something new, the data has to come with you — intact, complete, and without losing a week of trading.
That’s the job. Everything else is detail. 0114 249 1036
Database migration
What kind of move is it?
Choose what’s happening and we’ll point you to the right place.
Version upgrades
The commonest and usually the most straightforward — until it isn’t.
The upgrade itself is rarely the hard part. What takes the time is everything sitting on top: the application, the reports, the integrations, the scheduled jobs, and the deprecated syntax that’s worked fine for fifteen years and won’t compile on the new version.
We check all of that before the upgrade rather than discovering it afterwards.
Out of support? SQL Server 2016 went end-of-life in July 2026. MySQL 5.7 in 2023. Access 2010 and 2013 are long gone. Running unsupported means no security updates, which is the thing that fails an audit or a cyber insurance renewal.
Moving between database engines

Access to SQL Server. MySQL to SQL Server, or the other way. SQL Server to Azure SQL. Anything to PostgreSQL. Older or more obscure engines where the business has outgrown what’s available.
The data itself usually moves without much drama. The work is in the things around it:
- Data types that don’t map cleanly — dates, decimals, text fields and the ones holding something they were never meant to hold
- Keys, constraints and indexes chosen deliberately rather than whatever the conversion wizard produces
- Stored procedures, views and triggers rewritten rather than translated word-for-word
- Reports — often the largest single piece, and always underestimated
- The application on top, which has to be pointed at the new database and tested properly
- Character sets and collation, which is how you end up with question marks where the apostrophes were
We’ll tell you which parts are mechanical and which need real work, before you commit.
New server, new host, new hardware
Hardware coming out of warranty, a datacentre move, a hosting change, or coming off a server that’s now the oldest thing in the building.
Usually the right moment to fix the storage layout, memory configuration and maintenance regime that somebody guessed at years ago and nobody has touched since. Those changes are near-free while you’re moving and expensive afterwards.
Getting your data out of a system you’re leaving
The one nobody warns you about.
You’ve chosen a new system. The new supplier will import your data — but only the current records, or only two years, or only the fields their product happens to have. Everything else is your problem, and your old supplier has limited interest in helping you leave.
We get the data out properly:
- Extract everything, including the history the new system won’t take
- From formats that don’t want to be read — proprietary files, systems with no export, applications where the only interface is the screen
- Into something you can use — loaded into the new system where it fits, and held in a queryable archive where it doesn’t
- An archive you can actually search, so “what did we charge them in 2019” stays answerable after the old system is switched off
Do this before the old system’s licence lapses or the server gets decommissioned. Once it’s off, the options narrow considerably and the costs don’t.
Merging two systems
An acquisition, a branch consolidation, or two departments who each built their own thing.
Two customer lists with substantial overlap, two numbering schemes, two sets of product codes, and two teams who each believe theirs is the correct one.
The technical merge is the easy half. The decisions — which record wins, what happens to the duplicates, how the codes reconcile — need making by people who know the business, and we’ll set those out so they can be decided rather than defaulted.
Expect data cleansing to be part of it → data cleansing
How we keep a migration dull

Upgrades and migrations are necessary, and they’re among the riskiest things you’ll do to a working system. They introduce bugs, change performance and take systems down unexpectedly — when they aren’t planned properly.
So we plan, test and rehearse before the real thing.
- Assessment first. What’s there, what depends on it, what talks to it, and what breaks.
- Rehearsed on a copy, and timed, so the outage window we quote is one we’ve measured.
- Cutover agreed in advance, with a cut-off time for calling it off.
- A written rollback plan, and the old system kept intact until you’re satisfied.
- Counts and totals reconciled afterwards, signed off by someone on your side who knows what the numbers should say.
- We’re still here the week after → database support
Before you commit
Two things worth doing first.
Find out what you’ve actually got. Most migrations turn up something nobody knew about in the first week → database health check
Fix the data while it’s easy. There’s no sense carrying twenty years of duplicates into a new system, and migration is the one moment when sorting it out is straightforward → data cleansing
Case studies
Commercial Catering Service & Maintenance (field service)
Aire Valley Catering
Field service apps that work with no signal
Aire Valley Catering’s engineers work in commercial kitchens across the UK, often with no usable signal, and every job still has to be recorded. We built four production…
View case study
Professional Services (immigration, compliance and right-to-work consultancy)
Dearson Winyard International
Case management, reporting and a client portal
Dearson Winyard International handles immigration, compliance and right-to-work cases, and its work runs on documents and deadlines. We support and develop the case management system, the management dashboards…
View case study
Manufacturing & Engineering (precision fasteners and components)
Bolt & Nut Manufacturing
Certificates and stock you can trace from goods-in to the job
Bolt & Nut Manufacturing had grown, and its system had grown with it, but too much still depended on people remembering things. We extended the system it already…
View case study
What’s moving, and from what to what?
Tell us what you’re running, where it needs to go, and when you can take an outage. We’ll tell you what’s involved, what it costs, and whether it needs doing yet.
